Power situation in Tamil Nadu is expected to ease in next six months with the commissioning of North Madras and third unit of Mettur thermal power stations, the Highways Minister, Mr Edapadi Palanisamy, has said.
Within six months, the North Madras power plant (first stage) would be commissioned contributing 600 MW to the state grid, he said at an AIADMK function in Mecheri after distributing welfare assistance to several people
Within six months, the North Madras power plant (first stage) would be commissioned contributing 600 MW to the state grid, he said at an AIADMK function in Mecheri after distributing welfare assistance to several people
No comments:
Post a Comment